Project Summary
This Project will improve Lamme Road, from Alex-Bell Road to Bushwick Drive and a small area at the intersection of Alex-Bell Road east of Lamme Road, in Miami Township. The main focus of this project will be the replacement of the bridge (Bridge #MOT-175-1.37) over Holes Creek, which will include the installation of sidewalks on the new bridge. Lamme Road pavement will be milled and resurfaced from Alex Bell Road to Bushwick Drive. The traffic signal at the intersection of Lamme Road and Alex-Bell Road will be replaced, as well as deteriorated sections of curb and sidewalk along the east side of Lamme Road, south of Holes Creek, and along the north side of Alex-Bell Road at the corner. It is anticipated that the project will begin in April of 2023. Due to the replacement of the bridge over Holes Creek, the section of Lamme Road within the Project area will be closed to all but local vehicular traffic. Pedestrian traffic, however, will be maintained across the bridge throughout construction.
Lamme Road is expected to reopen to vehicular traffic in mid-October 2023.